I buy
Batteries, inverters and megawatt chargers for AVIGUS's own hubs. First lane: Antwerp port ↔ Duisburg, 20 electric trucks.
AVIGUS · World Energy Storage Conference · Ningde, 14–16 October 2026
Wind, solar and cheap imbalance power go into the battery. Electric trucks take it out in 20 minutes at a megawatt charger. I am at the conference to find the batteries, inverters, chargers and the people behind them.
Five minutes, step by step
Who you are talking to
I run AVIGUS BV in Boom, next to the port of Antwerp, Belgium.
Two of my websites are live today: every heavy electric truck and charger of IAA 2026, and what an electric truck really costs per country.
The charging hubs are planned, not built. That is why I am here: to choose the batteries, inverters and chargers that go in first.
Batteries, inverters and megawatt chargers for AVIGUS's own hubs. First lane: Antwerp port ↔ Duisburg, 20 electric trucks.
Your systems to charging-hub owners, truck fleets and solar and wind parks in Europe. One contact, one contract.
Permits, grid connection, installation, commissioning, service and spare parts, in Europe.
Where AVIGUS stands today:
The problem
One megawatt charging plug can draw up to 3.75 MW. Three trucks charging at once draw more than ten megawatts.
In one European country alone, nearly ten thousand companies queue for a bigger grid connection, and a new high-voltage line takes eight to twelve years to build.
A charging hub that waits for the grid is a hub that earns nothing.
3.75MW
Source: IEC TS 63379 (Feb 2026); SAE J3271 (Mar 2025)
≈10,000
Source: Mobility Energy, 12 Feb 2026
8–12years
Source: Energy Global, 15 Jul 2026
The opportunity
In 2025 the wholesale price went below zero for more than 520 hours in one European country, a record, driven by solar.
In 2026 the same market swung from almost −500 to +658 euro per megawatt-hour.
The EU installed 27 GWh of batteries in 2025 and needs about 750 GWh by 2030. A charging hub is the best place for them: cheap power in, megawatt charging out.
520h
Source: CREG, reported by VRT, 6 Jan 2026
€658/MWh
Source: oEnergetice.cz (2026); Test-Aankoop (May 2026)
27GWh
Source: SolarPower Europe, 28 Jan 2026
The solutionPLANNED
The battery takes wind, solar and imbalance power when it is cheap or negative, and feeds the megawatt chargers when the trucks arrive.
A one-megawatt grid connection then serves up to three megawatts of charging, and the hub can open years before the big connection comes.
First AVIGUS lane: Antwerp port ↔ Duisburg, 20 electric trucks driving day and night, drivers taking turns at the hub, with beds, showers and toilets.
Source: Battery sizing: AVIGUS estimate (a 1 MW connection plus about 5 MWh of storage covers three trucks charging at once)
8.5GWh
Source: AVIGUS business case, Oct 2026 (estimate)
€0.30/kWh
Source: AVIGUS business case, Oct 2026; Milence tariffs 2026
20min
Source: AVIGUS business case, Oct 2026
What I am looking for at your booth
Containers, inverters, chargers and the software that trades the power. Proven in Europe, or ready to be.
What I need from you:
The market
Antwerp is the start: the first lane, the first hub, the first battery.
eTruckTCO.eu knows diesel prices, road tolls and charging prices in 11 countries and 13 toll zones. That is where the next hubs go.
eTrucksAndChargers.com lists every heavy electric truck and charger of IAA 2026. Your chargers can be listed there today.
Every heavy electric truck and charger of IAA Transportation 2026, with sources.
Source: eTrucksAndChargers.com (13 Oct 2026)
Open eTrucksAndChargers.comWhat an electric truck really costs, per country: diesel, tolls, charging.
Source: eTruckTCO.eu (5 Oct 2026)
Open eTruckTCO.euAfter this meeting